Work continues on our #york project, piloting a short 30m section, the video shows the first step of the #guidedaugerboring#trenchless method.
Second stage will be the installation of reueusable steel casing and augers then to complete the #pipeline Naylor Drainage Ltd DN300 #denlok#clay#microtunneling#jacking pipe will be installed.
Check out a detailed 3D animation of our #guidedaugerboring method on our services page.
The mts Perforator PBA85V guided thrust boring system (pull back technique) was used to install 700m of gravity sewer in Scarborough. 180mm SDR11 black PE pipe was installed to "straight" accurate line and gradient in various drive lengths betweeen 55 to 65 metres.
Take a look at our project video of our recently completed Guided Auger Boring works. A total of 36 metres of DN600 Concrete Pipe was installed to accurate line & grade.