Call us on telephone icon 01226 785 722

News

8th September 2025

Trenchless Solutions were proud to support Bethell Group with a trenchless installation across two drives, whilst also maintaining minimal disruption to the surrounding environment and existing utilities.

Using our PBA205V guided auger boring system, we installed DA650 GRP jacking pipes beneath both a live railway and a canal, ensuring seamless connections to existing sewer infrastructure.

Get in touch today to find out how our trenchless methods can assist with your next project:

01226 785722
enquiries@trenchlesssolutions.co.uk

Share



Accreditations

  • Acclaim Accreditation

  • Achilles UVDB Verified

  • Constructionline Gold

  • SSIP

  • UKSTT