Call us on telephone icon 01226 785 722

News

29th May 2015

Second Drive Completed at Wakefield

The second drive has been completed on the Wakefield project. The project involved two crossings a 62m drive and a 53m drive installing Naylor Denlok DN150 clay drainage pipe. The project was completed using our mts Perforator guided thrust boring equipment.

Share



Archive

Accreditations

  • Acclaim Accreditation

  • Achilles UVDB Verified

  • Constructionline Gold

  • SSIP

  • UKSTT