Project completed towards the end of last year. 2 crossings installed of DN225 #clay#drainagepipe totalling 83m in #droylsden using our 85t guided auger boring system.
Trenchless Solutions own and operate the largest fleet of #augerboring rigs within the #UK contact the team if you think we can help with your next project. #teamtrenchless
The mts Perforator PBA85V guided thrust boring system (pull back technique) was used to install 700m of gravity sewer in Scarborough. 180mm SDR11 black PE pipe was installed to "straight" accurate line and gradient in various drive lengths betweeen 55 to 65 metres.
Take a look at our project video of our recently completed Guided Auger Boring works. A total of 36 metres of DN600 Concrete Pipe was installed to accurate line & grade.