Call us on telephone icon 01226 785 722

News

8th May 2015

Naylor Denlok DN300 Installed at Manchester

We have recently completed our guided thrust boring project in Manchester. 55m of Naylor Denlok DN300 clay drainage pipe was installed to accurate line and grade using the tried and tested mts Perforator PBA85V drilling rig.

Share



Archive

Accreditations

  • Acclaim Accreditation

  • Achilles UVDB Verified

  • Constructionline Gold

  • SSIP

  • UKSTT