Call us on telephone icon 01226 785 722

News

12th September 2011

Jacking DN700 GRP Hobas pipe

pictures of jacking pipe to complete the 1st run at Blackburn

Jacking Pipe

Once the pipe was jacked through to the reception pit the o/d of the pipe was checked for gougeing, there was no visible damage noted!!

Removing casings in the reception

Pulling Augers


Share



Archive

Accreditations

  • Acclaim Accreditation

  • Achilles UVDB Verified

  • Constructionline Gold

  • SSIP

  • UKSTT