View looking from the launch pit to the reception pit on audley range
Site setup
Set up ready for the pilot bore installation the gradient was 154 mm over the 58m length, accuarcy was paramount
58m to pilot
Pilot head reaches the reception pit (see blue line on left side of the sheet pile) once the engineer had checked the position it was found the level was 3.5mm low over the 58m all credit to Chris the site engineer and our very experienced highly skilled operator Billy Bewsher
Change over the machine for the second stage of the operation,set up and instal 762mm o/d steel casing
PBA155 Machine, welding the steel casings together before they are installed through the ground
Loading Casings
Dealing with Cobbles!
Cutting head reaches reception pit
Hobas GRP DN700 Pipes