Call us on telephone icon 01226 785 722

News

21st April 2011

DN225 Drainage Installation

Sussesfully completed 22metres of DN225 what was dificult about this project is the reception pit was an existing outfall in the main road, disruption was kept to a minimum as we used the 1200mm manhole as the reception shaft, for more details please contact us.

Share



Archive

Accreditations

  • Acclaim Accreditation

  • Achilles UVDB Verified

  • Constructionline Gold

  • SSIP

  • UKSTT