Great finish to the week, our Somerset project has been completed successfully. Our final drive on the Nottingham project is now complete. Last but not least the pilot bore on the third drive at Wyke, Bradford is now been completed.... …
The mts Perforator PBA85V guided thrust boring system (pull back technique) was used to install 700m of gravity sewer in Scarborough. 180mm SDR11 black PE pipe was installed to "straight" accurate line and gradient in various drive lengths betweeen 55 to 65 metres.
Take a look at our project video of our recently completed Guided Auger Boring works. A total of 36 metres of DN600 Concrete Pipe was installed to accurate line & grade.