We have recently completed our guided thrust boring project in Manchester. 55m of Naylor Denlok DN300 clay drainage pipe was installed to accurate line and grade using the tried and tested mts Perforator PBA85V drilling rig.
The mts Perforator PBA85V guided thrust boring system (pull back technique) was used to install 700m of gravity sewer in Scarborough. 180mm SDR11 black PE pipe was installed to "straight" accurate line and gradient in various drive lengths betweeen 55 to 65 metres.
Take a look at our project video of our recently completed Guided Auger Boring works. A total of 36 metres of DN600 Concrete Pipe was installed to accurate line & grade.