First Couple of days at our York project, overall scheme is to install various lengths of Naylor Clay drainage pipe DN225 and DN300, the 1st drive is to install DN225 underneath the students dorm building.
Setting Up Site
1st location at York Uni, preparing to drill 26m underneath the halls of residence
Ready to lower the drilling rig into the 2.4m shaft
First Stage Piloting Operation
Steering Head Reaches Reception Pit
Second Stage Casing and Augers are loaded
View from the rear of the reception pit, the drainage pipe installation was directly underneath the students dormitory building in front.