Call us on telephone icon 01226 785 722

News

2nd December 2014

Work started for installation of 2 number 150mm drainage pipes

Work started at Beeston school today installation of 2 number 150mm drainage pipes underneath the existing building, connecting the drainage for the new extension building at the rear of the school

Share



Archive

Accreditations

  • Acclaim Accreditation

  • Achilles UVDB Verified

  • Constructionline Gold

  • SSIP

  • UKSTT