Second and final drive completed at Wakefield, installation of 62m and 53m Naylor Denlok DN150 clay drainage jacking pipe using the mts Perforator guided thrust bore equipment, great job lads Mark, Ollie, Mick and Jamie.
The mts Perforator PBA85V guided thrust boring system (pull back technique) was used to install 700m of gravity sewer in Scarborough. 180mm SDR11 black PE pipe was installed to "straight" accurate line and gradient in various drive lengths betweeen 55 to 65 metres.
Take a look at our project video of our recently completed Guided Auger Boring works. A total of 36 metres of DN600 Concrete Pipe was installed to accurate line & grade.