Trenchless Solutions offer this No-Dig technique of Impact Moling as a fast, low cost reliable method for installation of pipes, cables and ducts from 20mmØ up to 180mmØ distances from 5 metres up to 20 metres, through various ground types.
For more information on the services we offer visit
The mts Perforator PBA85V guided thrust boring system (pull back technique) was used to install 700m of gravity sewer in Scarborough. 180mm SDR11 black PE pipe was installed to "straight" accurate line and gradient in various drive lengths betweeen 55 to 65 metres.
Take a look at our project video of our recently completed Guided Auger Boring works. A total of 36 metres of DN600 Concrete Pipe was installed to accurate line & grade.