The Team Have Done a Fantastic Job on This Project!!
News
9th June 2023
The Team Have Done a Fantastic Job on This Project!!
The team have done a fantastic job on this project!! #teamtrenchless were employed to install a 610mm steel carrier casing then install a 560mm SDR11 PE pipe from the 6.5m shaft to the underground tank within the WTW.
Line and grade was paramount on this project so TSL opted to use the accuracy of our #guidedaugerboring rig
If you have or think you may require our assistance on your next project contact the team.
Trenchless Solutions Limited own and operate the largest fleet of #augerboring equipment withing the Uk, we can help you with your next project from conception through to completion
The mts Perforator PBA85V guided thrust boring system (pull back technique) was used to install 700m of gravity sewer in Scarborough. 180mm SDR11 black PE pipe was installed to "straight" accurate line and gradient in various drive lengths betweeen 55 to 65 metres.
Take a look at our project video of our recently completed Guided Auger Boring works. A total of 36 metres of DN600 Concrete Pipe was installed to accurate line & grade.