It might have only been a short week but the lads have completed the 3rd drive at #leyland. 35m of DN300 Naylor Industries PLC#clay jacking #pipe installed to accurate line and grade using our #perforator#guidedaugerboring system. Contact the team on 01226 785722 if you think we can help with your next project.
The mts Perforator PBA85V guided thrust boring system (pull back technique) was used to install 700m of gravity sewer in Scarborough. 180mm SDR11 black PE pipe was installed to "straight" accurate line and gradient in various drive lengths betweeen 55 to 65 metres.
Take a look at our project video of our recently completed Guided Auger Boring works. A total of 36 metres of DN600 Concrete Pipe was installed to accurate line & grade.