I would say that was bob on for a 50m shot, great going lads #teamtrenchless next stage install casing and auger then finally jack the Naylor Industries PLC#clay#jackingpipe, all installed to accurate line and grade.
If you think we can help on your next project installing your utility ducts and pipelines using our various #trenchlesstechnology systems contact our team we would love to help and advise you.
The mts Perforator PBA85V guided thrust boring system (pull back technique) was used to install 700m of gravity sewer in Scarborough. 180mm SDR11 black PE pipe was installed to "straight" accurate line and gradient in various drive lengths betweeen 55 to 65 metres.
Take a look at our project video of our recently completed Guided Auger Boring works. A total of 36 metres of DN600 Concrete Pipe was installed to accurate line & grade.