Call us on telephone icon 01226 785 722

News

16th January 2012

HDD Work Continues at York

Installation of 315mm diameter SDR17 100m shots underneath the equestrian centre, in total there is 500m of 315mm and 1,000m of 180mm to be installed all keeping disruption to a minimum.

Share



Accreditations

  • Acclaim Accreditation

  • Achilles UVDB Verified

  • Constructionline Gold

  • SSIP

  • UKSTT