A site in Goldthorpe, South Yorkshire was selected for the first project where the installation of a 100m of 90mm water pipe down a carriageway was required, Morrison Utilities Services prepared the site, excavated the launch and reception pits. Trenchless Solutions arrived on site with the equipment; both companies worked well together and completed the two drives within the two days allocated for the works, with minimal disruption to residents, minimal reinstatement to the carriageway and cost effectiveness overall it had to be a win win end to the project.