Equipment loaded and going out to #upminster today. Our #perforator GmbH #guidedaugerboring system will be used for this project which will involve the installation of Naylor Industries PLC DN150 #clay Jacking #pipe
The mts Perforator PBA85V guided thrust boring system (pull back technique) was used to install 700m of gravity sewer in Scarborough. 180mm SDR11 black PE pipe was installed to "straight" accurate line and gradient in various drive lengths betweeen 55 to 65 metres.
Take a look at our project video of our recently completed Guided Auger Boring works. A total of 36 metres of DN600 Concrete Pipe was installed to accurate line & grade.