Equipment going out to Harwich today. This project will involve the installation of 20m DN150 Naylor Industries PLC Denlok clay jacking pipe and 20m lost steel casings using our Guided Auger Boring system.
The DN150 jacking pipe is fitted with EPDM seals and an injection moulded polypropylene sleeve and integral thrust ring, all elastomer components conform to the requirements of EN681-1.
The mts Perforator PBA85V guided thrust boring system (pull back technique) was used to install 700m of gravity sewer in Scarborough. 180mm SDR11 black PE pipe was installed to "straight" accurate line and gradient in various drive lengths betweeen 55 to 65 metres.
Take a look at our project video of our recently completed Guided Auger Boring works. A total of 36 metres of DN600 Concrete Pipe was installed to accurate line & grade.