Call us on telephone icon 01226 785 722

News

28th September 2014

DN500 Naylor clay drainage pipe at Marple near Stockport

Work finished at Marple near Stockport a great 35m pilot bore to exact line and grade installation of DN500 Naylor clay drainage pipe will continue on Monday. The Pilot bore was completed at Wigan to exact line and grade continuing with the installation of Hobas 575mm I/d GRP drainage pipe next week.

Share



Accreditations

  • Acclaim Accreditation

  • Achilles UVDB Verified

  • Constructionline Gold

  • SSIP

  • UKSTT