At Eaves Green in Chorley, our specialist team was called in by a client to tackle the installation of DN150 & DN225 vitrified clay drainage pipes.
Using our GAB 85V Guided Auger Bore machine, we ensured the installation was completed:
✔️ On line and level
✔️ With minimal surface disruption
✔️ Delivered to the highest safety standards
This project is another example of how trenchless methods provide cost-effective and sustainable solutions for underground infrastructure.
Well done to the TSL crew for their expertise and safe delivery.