Call us on telephone icon 01226 785 722

News

6th April 2022

5th Drive Complete at Oxford Working at 6m Deep Out of 2.4m Diameter Shafts

5th Drive complete at #oxford working at 6m deep out of 2.4m diameter shafts. 65m of DN225 Naylor Industries PLC #clay jacking #pipe installed to accurate line and grade using our #perforator #guidedaugerboring system. Trenchless Solutions own and operate the largest fleet of #augerboring rigs within the #UK.

Share



Archive

Accreditations

  • Acclaim Accreditation

  • Achilles UVDB Verified

  • Constructionline Gold

  • SSIP

  • UKSTT