Call us on telephone icon 01226 785 722

News

16th October 2015

3rd & 4th Drive Successfully Completed at Widnes

The 3rd & 4th drives have recently been completed at Widnes. These consisted of installing 58m of 560mm and 406mm dia lost steel sleeves. We will now move onto the final two drives of the project.

Share



Archive

Accreditations

  • Acclaim Accreditation

  • Achilles UVDB Verified

  • Constructionline Gold

  • SSIP

  • UKSTT