Call us on telephone icon 01226 785 722

Installing DN300 Clay Jacking Pipe

 

Take a look at our project video of our recently completed Guided Auger Boring works. A total of 63 metres of DN300 Naylor Clay Jacking Pipe was installed to accurate line & grade. This was carried out using our mts Perforator guided auger boring systems.

Accreditations

  • Acclaim Accreditation

  • Achilles UVDB Verified

  • Constructionline Gold

  • SSIP

  • UKSTT