See below for some examples of our aerial footage.
Project video of our recently completed Guided Auger Boring works. The project involved installing Naylor Denlok DN300 Clay Pipe under the A52 Edwalton, Nottingham. This was carried out using our mts Perforator PBA85V guided auger boring system.
Take a look at our product video of our recently completed works in partnership with Morrison Utility Services at Selby. A total of 240 metres of 90mm SDR11 MDPE Water Pipe was installed in a total of 3 days.
Take a look at our project video of our recently completed Guided Auger Boring works. A total of 63 metres of DN300 Naylor Clay Jacking Pipe was installed to accurate line & grade. This was carried out using our mts Perforator guided auger boring systems.
The mts Perforator PBA85V guided thrust boring system (pull back technique) was used to install 700m of gravity sewer in Scarborough. 180mm SDR11 black PE pipe was installed to “straight” accurate line and gradient in various drive lengths betweeen 55 to 65 metres.