The mts Perforator PBA205V guided auger boring system was used to complete a trenchless installation across two drives in support of a project with Bethell Group. DA650 GRP jacking pipes were installed beneath a live railway and a canal, maintaining accurate line and level while minimising disruption to the surrounding environment and existing utilities. The works ensured seamless connections into the existing sewer infrastructure.